Pairing Batteries with Colocation Sites & Design Life

Time: 15:25 - 16:10
Date: 27 August 2025

Synopsis

There are 5GW of batteries in the NEM pipeline which are co-located with other renewable assets. Presenting a whole host of both new opportunities and obstacles to navigate, the final session of day two looks at why batteries are being collocated, what benefits are there, and what are the major concerns?

  • AC Coupled vs DC Coupled?
  • How can designing your battery with colocation in mind streamline the process towards operations, and open up additional economic incentives?
  • When pairing your batteries with colocation sites, how does design impact plans? I.e. how can you navigate different design life’s?

Speaker

« Back